Concrete those walls

No Comments

Today is the day we cap the walls. A double ring of steel reinforcement runs around all the walls in a trough created by building up the walls on the facing sides. Clive is on the cement mixer creating concrete which is bucketed all around the walls to a depth of 10-15cm. Murray is learning French all day but Giselle is helping again. Hans and I try to keep up with Clive by getting rid of concrete as fast as he can make it. Giselle buckets it up and passes them over the walls and Breezy is spreading it out and tamping it in. By 1pm all is done and the weather is changing. We just got all the walls covered when the heavens opened. Lunch was had under a tarpaulin and we retired to the bar for a celebration at 3pm as no more could be done. In the evening we got a text from my parents to say they are flying out the next night. Fantastic!!

Categories: Autumn 2007, The Project

Productive Day with Gizelle

No Comments

Van returned safely, Vinnie all healthy so back to normal. Mum and Dad left today via Carcassone, looking forward to hearing about it. Not sun but no rain all day until 7pm when we had just reached the bar!!! A day of getting things done, or so it felt like. We had Gizelle on site today, nice to have some female company and someone my own size!!! well actually smaller than me would you believe it? Probably not but true!!! Walls built up, “jambe de force” constructed and cemented in. These just need to be nailed with old authentic nails. Steel reinforcement around the walls, entwined and ready for capping tomorrow. Me up and down the hill all day shovelling, gravel and delivering water. Muddy as!!! Visit from Pierre who insists on helping us tomorrow, which will be a useful extra pair of hands for capping day. All set for a big day tomorrow weather permitting.

Categories: Autumn 2007, The Project

RAIN!!!

No Comments

Hoping of better weather was wasted, it was a foul day!!! I headed off to get the hire van, to my horror a HUGE van with new rear window…eek must plan route home to involve no parking and no reversing!!! Mission accomplished!!! Phew. Parked the van at the end of the track not going up there with that huge thing…..and wandered up the 4X4 to crack on with work. Hans was at home due to rain. Murray, Clive and Al were battling on with cementing, walls, etc. not ideal and even less ideal as the cement mixer had broken. By 3.30pm it was torrential, we were all drowned rats so packed up and headed back at 4pm. Hot bath before we headed out to meet M&D for supps at St Lizier. They had had a good day in spite of the weather, a drive into Bethmale valley, lunch and a wander in St Girons and reading on the balcony!!!

Swollen River    Clive's family arrive

Categories: Autumn 2007, The Project

Mum and Dad’s Visit

No Comments

The morning was spent trying to sort out Vinnie. Patrick very kindly gave us a lift down to Vinnie to hand the keys over to the garage tow service and then gave us a lift home. Now we will wait and see what AGF say? Mum and Dad arrived at about 11.30 after a lovely drive over from St Girons via Alos, we have yet to do it, but it is meant to be lovely. We had a coffee at the bar, which was busy with the chase and other folk. Then we headed up in Patrick’s 4X4 to show Mum and Dad the Bergerie. Not great weather but not raining and even better that we could see the cascades even if we could not see the top of the mountains. Al and I had had a trial run re getting Mum up the hill in the trailer with the muck truck and all padded out for her it worked a treat. I was very pleased that we got up to the back of the bergerie so that Mum could see it all in action. We also managed to get Mum inside the bergerie too. We had a snack picnic lunch at the back with a bottle of rose, local cheeses and wild boar salami which all went down really well. We sent Mum and Dad off for another mountain drive in the pm while we tried to sort out the van!!!! Nothing went to plan and good old Patrick lent us hiss car to get to St Girions to meet M&D for supper a their hotel. A lovely night, with everyone on great form and a band playing too. We left in sheeting rain to head back to Salau and hope for better weather….

Modern Transport On Site

Categories: Autumn 2007, The Project

Problems with Vinnie

No Comments

A rest day. And boy does my body need one. Started with a lie in, scrambled egg breakfast and a trip to St Girons. Picked up another half ton of cement to go with the ten ton of ballast arriving on Monday then an amble round the market. Followed that with food shopping for the week, lunch and then unloading the cement up at the grange (so missed the rugby). Siesta and then a drive down to St Girons for a meal with Breezy’s folks. The van broke down just short of Seix. After a short re plan Breezy’s folks came up to Seix and we abandoned the van by the road and got a lift with a local lass Cecile. Dinner was lovely. Sort out the van tomorrow?

Categories: Autumn 2007, The Project

It’s Friday…rest time!!!!

No Comments

Two weeks to go and we have a skeleton of a roof. By all accounts it will happen. I am knackered and seriously need a day off labour. Breezy seems to be coping better but she has a brave face. Slowly dismantling the dry stone wall at the back of the pad in order to rebuild the top of the walls of the building. Seems a shame but we have priorities to consider and we can rebuild a wall later but we need a roof. On going wars on site over tape measures. Clive always has one and everyone else mislays theirs; turned into an ongoing joke. Similar with favourite hammers and trowels. Everyone briefed to bring their own hammers and trowels from now on and there is a stash of measures on entry, Had to get one out of Murray’s pocket this evening on exit otherwise they will all end up at his place. The truss frames look fab. Walls are coming on. Should be ready to cap the walls on Tuesday and sarking the roof Wednesday with poplar (volage) or planking for those building numpties.

Photos of the truss in place and the final parts being fitted “les jambes de force”. Once these are in place the weight of the roof is spread into the walls and the acro props can be removed.

 

Categories: Autumn 2007, The Project

Beton and aches & pains

No Comments

After a grotty forecast for today the sky had patches of blue when we woke up. Murray had French lessons today so we were down to Breezy, Hans, Clive and myself. By the end of the day we achieved a complete roof structure and also fettled about a third of the walls up to the wall plate. By that I mean; the walls are all uneven so having taken a level of the ridge beam, all the walls need building up to meet the roof. Bearing in mind that they are not entirely straight and have been held together with earth and gravity it means collecting rocks, dismantling down to something solid and then building them up using concrete as glue. We are both sore. Hands and backs. Currently running a bath for Breezy and then a back massage using my elbows, as my hands will not do that at the moment. Tomorrow we are all going to be on the walls. Missed Murray today as he makes a good victim.

All the leaves have started turning and each day the colours get more beautiful.

 

Categories: Autumn 2007, The Project

Wet day

No Comments

Weather has definitely not aided work today. The morning saw the second frame being constructed very quickly. However, rain was threatening all morning and then it finally arrived. We had an early lunch before the boys started levelling the second frame into place. Not ideal in the pouring rain.  I decided to leave them to it, as there was nothing I could help with. They continued on battling with the elements to secure the frame in place as more bad weather is forecast for tomorrow and I think they would all have felt happier leaving it fast rather than dangling!!!

We did get the second truss secure as Breezy suggested. Also managed to complete the ridge and put rafters on a third of the building. Some preparation is done ready for tomorrow and there is a tarp over a third of the roof giving an area that we can work under in foul weather. The outlook for tomorrow is not great.

Categories: Autumn 2007, The Project

Big Progress

No Comments

Clive got on site before us and had already started whittling a truss. Security is not really tight with no roof at all and steps that lead up the back over the wall.  It was a beautiful day, almost too hot around lunchtime and all of us guzzling lots of water.

The morning’s challenge was to get one of the trusses up and in place using Clive’s mighty new winch. A very handy new toy!

Clive and Hans had a bit of final touches to the truss framework before it was heave ho into place and it looks great.

That then needed securing by getting some of the ridge beam in and cementing the truss into place. Lots of cement loads for Al and Murray to put on the gable end to make it really start looking like a roof. All the guys are working really hard and achieving loads which is great to see.

Seeing a third of the framework in place was just great.

Chris left today and headed home with a lot less than he arrived with. He has been a HUGE help in all ways. Many, many thanks Chris. Coming back for the “roof party”????

Truss oneTruss one 

Categories: Autumn 2007, The Project

Construction Starts

No Comments

Clive turned up still hung over from Saturday, to be fair he cleared up after the party on Sunday morning and started drinking again celebrating his wedding anniversary and spent the afternoon in bed. I gave him a bottle of water.

Clive finished bashing out holes in the gable wall to accept floor joists while Hans and I finished the middle of the floor and placed poplar boards down to create a platform at 1st floor level. Clive and Hans then started working on the 1st truss.

It is a weird feeling as the building starts to take shape again after spending a week taking it apart.

By the end of the day we had a truss virtually built and the whole of the first floor as a platform to work off. An hour to finish the truss and we should be rocking tomorrow!! 

Categories: Autumn 2007, The Project