Generator & Flooring

No Comments

A full day was planned for today as Al was very keen that we should try and get all the flooring down in the outbuilding, mezzanine and main floor. Although small, these things still take time. Al was very patient whilst we went through how to floor again and I set to upstairs whilst Al started prepping the downstairs with batons ready for the flooring to go down.

We fired up the generator which went all day. Thanks Dad, a really lovely pressie and it will get a lot of use, we will think of you each time we use it, I am sure. We had the generator running in the workshop which was great which meant as we could not hear it, made working much more pleasant.

Thanks Dad the FAB generatorThanks Dad the FAB generator  Finsished the floor and a finished Breezy too!!!Finsished the floor and a finished Breezy too!!!

A late lunch and we had the mezzanine done and the batons down, backs beginning to ache a bit too!!!

The challenge had been set and by 730pm we had got the rest of the floor down and it looks great and creates more light in there as well, quite transformed from a few weeks ago when we arrived, almost habitable!!!!

By the time we had tidied away and put dinner in the oven, had a shower etc etc it was 10pm we were starving so raost chuck went down well. A quick game of “Dicewords” which is a game Dad gave us and we are just getting into it, makes a change from Scrabble. A few more layers on the bed as it was still quite nippy and bed by midnight a late night for us!!!

Categories: Spring 2009, The Project

Leave a Reply

Your email address will not be published. Required fields are marked *