Finished Pointing

Three loads of mortar saw the end, yes the end of pointing up the walls of the out building. Yippee.

A late lunch and then we finished assembling the table legs so that we completed the table too.

This entry was posted in Spring 2009, The Project. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *